


Customize
About Item
Our HVAC & Air Filtration Integration Service provides complete design, installation, and commissioning of controlled airflow systems for modular clean rooms, tissue culture labs, biotech facilities, and pharmaceutical support areas.
This service ensures ISO 7 / ISO 8 compliant air quality standards through proper air handling, HEPA filtration, pressure balancing, and temperature-humidity regulation.
Designed for contamination-controlled environments where airflow precision directly impacts productivity and quality.
🔧 Scope of Work
1️⃣ HVAC System Design
Air change rate calculation (ACH)
Heat load assessment
Pressure zoning design
Clean room airflow mapping
2️⃣ Air Handling Unit (AHU) Installation
Clean room compatible AHU setup
Pre-filter & fine filter integration
Cooling coil installation
Blower & airflow balancing
3️⃣ HEPA Filtration Integration
Ceiling-mounted HEPA filter modules
Terminal HEPA box installation
H13 / H14 filtration options
Filter leak testing provision
4️⃣ Ducting & Air Distribution
GI / powder-coated duct fabrication
Supply & return air routing
Air grille & diffuser installation
Pressure differential zoning
5️⃣ Environmental Control System
Temperature control (18–25°C typical range)
Humidity control (45–65%)
Digital monitoring integration
Alarm & alert system compatibility
🔬 Technical Specifications (Typical)
ISO 8 (Class 100,000) compliant airflow
Optional ISO 7 readiness
15–25 Air Changes per Hour (customizable)
HEPA efficiency ≥ 99.97% @ 0.3 microns
Pressure differential control ±5–15 Pa
Energy-efficient inverter-based system
🌿 Ideal Applications
Tissue culture inoculation rooms
Growth chambers
Biotech research labs
Seed processing clean areas
Pharmaceutical support zones
🚀 Key Benefits
✔ Reduced contamination risk
✔ Stable temperature & humidity
✔ Controlled pressure cascade
✔ Improved production consistency
✔ Energy-optimized airflow design
✔ Compliance-ready installation
📦 What Is Included
Technical site audit
Airflow & heat load calculation
Equipment supply coordination
Installation & duct integration
Air balancing & calibration
Performance validation support
⏳ Execution Timeline
Design & Planning: 5–7 days
Installation: 10–20 days
Testing & Commissioning: 3–5 days
(Timeline depends on project scale)

