


Customize
About Item
🔹 Service Overview
Our Clean Room Flooring Solutions Service provides seamless, hygienic, and contamination-resistant flooring systems designed specifically for clean rooms, tissue culture labs, biotech facilities, and pharmaceutical support areas.
We deliver epoxy, PU self-leveling, and vinyl-based flooring systems engineered to maintain particle control, chemical resistance, and easy sanitization — ensuring ISO 7 / ISO 8 compliant environments.
This service includes surface preparation, moisture treatment, application, finishing, and compliance-ready installation.
🔧 Scope of Work
1️⃣ Surface Assessment & Preparation
Existing floor inspection
Moisture testing
Surface grinding & leveling
Crack & joint treatment
2️⃣ Epoxy Flooring System
Anti-static epoxy coating
Self-leveling epoxy application
Chemical-resistant finish
Smooth, seamless surface
3️⃣ PU Self-Leveling Flooring
Flexible polyurethane system
Impact & abrasion resistant
Thermal shock resistant
High durability for heavy usage zones
4️⃣ Vinyl Clean Room Flooring
Homogeneous sheet vinyl
Heat-welded joints
Anti-bacterial surface finish
Suitable for modular clean rooms
5️⃣ Coving & Seamless Finishing
50–100 mm coving radius
Wall-to-floor seamless transition
Dust-trap elimination
Hygienic corner finishing
🔬 Technical Features
Seamless, joint-free finish
Anti-fungal & anti-microbial surface
Low VOC application options
Static dissipative (ESD) option available
Easy cleaning & sterilization
Compatible with positive pressure environments
🌿 Ideal Applications
Tissue culture growth rooms
Inoculation rooms
Biotech laboratories
Pharmaceutical support zones
Seed processing clean areas
🚀 Key Benefits
✔ Eliminates dust traps
✔ Reduces microbial growth
✔ High chemical resistance
✔ Long service life
✔ Easy maintenance
✔ ISO-compliant environment support
📦 What Is Included
Technical consultation
Floor system selection (Epoxy / PU / Vinyl)
Surface preparation
Material application
Coving installation
Final inspection & finishing
⏳ Execution Timeline
Surface Preparation: 2–4 days
Application: 2–5 days
Curing Time: 24–72 hours
(Timeline depends on floor size & system type)

