Customize
About Item
We perform complete load assessment before recommending DG capacity:
Total connected load calculation (kW / kVA)
Motor starting load consideration (HVAC, compressors)
Critical vs non-critical load segregation
Power factor evaluation
Future expansion buffer (20–25%)
Surge and peak load analysis
Deliverable:
DG sizing report
Recommended capacity document
DG Sizing Based on Total Load
Total connected load calculation (kW / kVA)
Motor starting load consideration (HVAC, compressors)
Critical vs non-critical load segregation
Power factor evaluation
Future expansion buffer (20–25%)
Surge and peak load analysis
Deliverable:
DG sizing report
Recommended capacity document
2️⃣ Silent Canopy DG Installation
Installation of industrial silent DG set:
Acoustic enclosure setup
Anti-vibration mounting
Foundation coordination
Weather-protected installation
Noise level compliance (as per CPCB norms)
Suitable for:
Tissue Culture Labs
Clean Rooms
Polyhouse Facilities
Cold Storage Units
3️⃣ Fuel Tank System Setup
Complete diesel storage & supply integration:
Day tank installation
External storage tank (if required)
Fuel piping & leak-proof fittings
Fuel level monitoring
Fire safety provisions
Designed for extended backup operations.
4️⃣ Exhaust & Acoustic Compliance
Safe emission and heat management:
Exhaust pipe routing
Thermal insulation
Silencer installation
Vertical discharge stack
Heat-resistant supports
Ensures:
✔ Safe emission
✔ Noise control
✔ Operator safety
5️⃣ AMF (Auto Mains Failure) Panel Integration
Automatic switching system:
Auto DG start during power failure
Automatic load transfer
Safe restoration to mains
Protection relay configuration
Complete control panel wiring
Ensures zero manual intervention.
6️⃣ Synchronization Panel (If Required)
For larger facilities:
Parallel DG operation
Load sharing
Automatic sequencing
Grid synchronization (if applicable)
7️⃣ Pollution Compliance Support
Support for regulatory approvals:
Emission compliance guidance
Stack height certification
Documentation support
Electrical inspector coordination
📦 Deliverables
Load calculation report
Installation layout drawing
AMF wiring diagram
Exhaust routing plan
Commissioning report
Warranty documentation
🎯 Ideal For
Tissue Culture Laboratories
Agri Biotech Units
Polyhouse Clusters
Cold Storage Facilities
Seed Processing Plants