


Customize
About Item
🔹 Service Overview
Our Clean Room Doors & Windows Installation Service provides hermetically sealed entry systems and double-glazed viewing panels designed for contamination-controlled environments.
Engineered for ISO 7 / ISO 8 compliant clean rooms, these doors and windows ensure airtight sealing, pressure stability, and smooth hygienic surfaces suitable for tissue culture labs, biotech facilities, pharmaceutical support zones, and seed processing clean areas.
This service includes design consultation, fabrication coordination, installation, and pressure-sealing validation.
🔧 Scope of Work
1️⃣ Clean Room Door Installation
Single leaf hinged doors
Double leaf clean room doors
Hermetically sealed door systems
Flush surface hygienic finish
2️⃣ Interlocking Door Systems
Mechanical interlock
Electromagnetic interlock
Airlock-compatible design
Pressure cascade compliance
3️⃣ Automatic Door Options
Sliding clean room doors
Sensor-based opening
Foot-operated access
Access control compatibility
4️⃣ Clean Room Windows
Double-glazed flush-mounted panels
Air-tight installation
Moisture-resistant sealing
Visibility integration between zones
5️⃣ Frame & Sealing Integration
Powder-coated / SS frames
Silicone-based airtight sealing
Pressure retention optimization
Gap testing & inspection
🔬 Technical Features
Smooth, non-porous hygienic surface
Flush design to prevent particle accumulation
Leak-resistant gasket sealing
Pressure differential compatible
Anti-corrosion material options
Compatible with modular panel systems
🌿 Ideal Applications
Tissue culture inoculation rooms
Growth chamber airlocks
Biotech lab clean entries
Pharmaceutical secondary zones
Seed processing clean areas
🚀 Key Benefits
✔ Maintains pressure stability
✔ Prevents cross-contamination
✔ Easy cleaning & maintenance
✔ Smooth hygienic surface finish
✔ ISO-compliant structural readiness
✔ Airlock system compatibility
📦 What Is Included
Door & window type selection consultation
Size customization
Frame & gasket integration
Installation & sealing
Alignment & pressure check
Interlock testing (if applicable)
⏳ Execution Timeline
Design confirmation: 3–5 days
Fabrication coordination: 7–12 days
Installation: 3–7 days
(Timeline varies by project size)

