🌿 Service Overview
Net Metering & Compliance Support Service assists agricultural facilities in obtaining required approvals for grid-connected solar systems and ensures regulatory compliance with DISCOM and electrical safety authorities.
Without proper compliance:
Solar export may be restricted
Utility penalties may apply
Safety approvals may be delayed
System commissioning may be blocked
This service ensures smooth documentation, inspection coordination, and grid synchronization testing for legally compliant solar operation.
Ideal for:
Polyhouse Farms
Irrigation Solar Projects
Cold Storage Solar Installations
Rural On-Grid Solar Systems
Hybrid Solar Projects
🔧 Detailed Service Scope
1️⃣ Net Meter Application Support
Application facilitation:
Application form preparation
Required document checklist
Technical specification submission
Load sanction verification
Transformer capacity confirmation
Ensures complete and accurate submission.
2️⃣ Utility Approval Documentation
Regulatory documentation:
Single-line diagram (SLD) preparation
Inverter specification documentation
Protection system details
Earthing & safety compliance records
Capacity calculation sheet
Reduces approval delays.
3️⃣ Safety Inspection Coordination
Authority inspection support:
Electrical inspector coordination
Pre-inspection readiness check
Protection relay verification
Earthing resistance testing
Compliance checklist preparation
Ensures inspection clearance.
4️⃣ DISCOM Compliance Guidance
Policy alignment support:
State-specific net metering policy review
Export limit verification
Meter compatibility confirmation
Protection device compliance
Documentation submission tracking
Ensures regulatory alignment.
5️⃣ Grid Synchronization Testing
Technical validation:
Anti-islanding protection test
Inverter grid sync testing
Voltage & frequency compliance check
Export power verification
Final commissioning support
Enables legal grid export operation.
📦 Deliverables
Net Meter Application File
Single-Line Diagram (SLD)
Compliance Documentation Package
Inspection Clearance Record
Grid Synchronization Test Report
Final Approval Support Summary
🎯 Key Benefits
✔ Faster approval process
✔ Legal grid export operation
✔ Avoid utility penalties
✔ Safe & compliant installation
✔ Smooth project commissioning